Project Askari Heights IV, Islamabad. Project 9xBlocks, 3 Bed apt (B+G+12)2xBlocks, 4 Bed apt (B+G+12) 1xBlock , 3 Bed apt (B+G+8)Scope of work for this Project Work included formwork, steel reinforcement, dewatering, concreting, curing, finishing work, and waterproofing of the foundations.Coordinated with design Section on design issues during actual construction activities. Implemented mandatory Health and safety requirements, arranged toolbox meetings for site workers to make everybody aware of different safety aspects and dangers at work site.
Supervised the construction of 2XNOS. Double storey Houses in DHA-3 & Bahria phase - 7 . CWO PROJECT IN CHATTAR. Inspected work sites regularly to ensure the construction as per approved shop drawings, project specifications and compliance with safety standards. Also kept track of materials to ensure compliance with the approvals. Attended progress meetings and discuss project details with subcontractors.Calculate quantities of materials required for timely procurement. Evaluated overall quality of work of subcontractors.Arranged documentation for vendors and subcontractors. Maintained the quality of work and ensure the completion of the project on time. Monitored equipment requirements and maintenance for smooth progress of construction.
Supervised Air Defence Officer Mess, project in lab 505 work shop, maintenance of SADAR army soldier blocks .Ensure the work is carried out as per specifications, method of statement & approved drawings. Inspection for approved material and co-ordination with clients, contractor, Architects and MEP.Conducted inspections to ensure that installed components are in conformance with the applicable drawings and project specification. Checked the quality of materials received on site and prepared quality reports, and snag lists for rectification of defects. Monitored Site variations and coordinating with th SDO.